連絡
Hokkaidō, Japan
Point-to-point trail in Hokkaidō, Japan. Downhill skiing.
- Distance
- 0.9 mi (1.5 km)
- Est. Time
- 20 min
- High point
- 2,392 ft (729 m)
- Difficulty
- Moderate
- Route type
- Point to point
Questions about 連絡
How long is 連絡?
連絡 is 0.9 mi (1.5 km) long. Most people take about 20 min.
How hard is 連絡?
GoTrails rates it Moderate, from its length and how much it climbs.
Where do you park for 連絡?
No parking mapped: check before you drive.
Are there water and toilets on 連絡?
No water mapped: bring all you need. No toilets mapped.
Is 連絡 shaded?
Partly shaded (35% under trees).
What can you do on 連絡?
Best for Downhill skiing.
Where can you eat near 連絡?
カフェMt751, 0 mi (0 km) from the start. 1 more places to eat.
Is this a good week for 連絡?
GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.
Trails near 連絡
- 初心者コース Hokkaidō · Easy · 1.9 mi (3.1 km)
- ゴールド3 Hokkaidō · Moderate · 0.4 mi (0.7 km)
- ロイヤル中級 Hokkaidō · Moderate · 0.3 mi (0.5 km)
- ディープパウダ Hokkaidō · Expert · 0.4 mi (0.7 km)
- ダイナミック Hokkaidō · Hard · 0.5 mi (0.9 km)
- スラロームバーン Hokkaidō · Moderate · 0.5 mi (0.9 km)
- ゴールド2 Hokkaidō · Moderate · 0.7 mi (1.1 km)
- 白樺2 Hokkaidō · Moderate · 0.7 mi (1.1 km)
GoTrails · Route data: © OpenStreetMap