鳩ヶ湯新道

Gifu Prefecture, Japan

Out-and-back trail in Gifu Prefecture, Japan. Hiking.

Distance
4.9 mi (7.8 km)
Elevation Gain
3,632 ft (1,107 m)
Est. Time
3 hr 25 min
High point
6,772 ft (2,064 m)
Difficulty
Hard
Route type
Out & back

Questions about 鳩ヶ湯新道

How long is 鳩ヶ湯新道?

鳩ヶ湯新道 is 4.9 mi (7.8 km) long. Most people take about 3 hr 25 min. It climbs 3,632 ft (1,107 m) in total, up to a high point of 6,772 ft (2,064 m).

How hard is 鳩ヶ湯新道?

GoTrails rates it Hard, from its length and how much it climbs.

Is 鳩ヶ湯新道 shaded?

Partly shaded (51% under trees).

What can you do on 鳩ヶ湯新道?

Best for Hiking. Surface: dirt.

Is this a good week for 鳩ヶ湯新道?

GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.

Trails near 鳩ヶ湯新道

GoTrails · Route data: © OpenStreetMap