鳩ヶ湯新道
Gifu Prefecture, Japan
Out-and-back trail in Gifu Prefecture, Japan. Hiking.
- Distance
- 4.9 mi (7.8 km)
- Elevation Gain
- 3,632 ft (1,107 m)
- Est. Time
- 3 hr 25 min
- High point
- 6,772 ft (2,064 m)
- Difficulty
- Hard
- Route type
- Out & back
Questions about 鳩ヶ湯新道
How long is 鳩ヶ湯新道?
鳩ヶ湯新道 is 4.9 mi (7.8 km) long. Most people take about 3 hr 25 min. It climbs 3,632 ft (1,107 m) in total, up to a high point of 6,772 ft (2,064 m).
How hard is 鳩ヶ湯新道?
GoTrails rates it Hard, from its length and how much it climbs.
Is 鳩ヶ湯新道 shaded?
Partly shaded (51% under trees).
What can you do on 鳩ヶ湯新道?
Best for Hiking. Surface: dirt.
Is this a good week for 鳩ヶ湯新道?
GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.
Trails near 鳩ヶ湯新道
- 白山禅定道 Ishikawa Prefecture · Hard · 5.7 mi (9.1 km)
- 石徹白道 Gifu Prefecture · Expert · 9.4 mi (15.2 km)
- 釈迦新道 Ishikawa Prefecture · Expert · 8.2 mi (13.1 km)
- 観光新道 Gifu Prefecture · Hard · 3.2 mi (5.2 km)
- トンビ岩コース Gifu Prefecture · Moderate · 2.2 mi (3.6 km)
- 展望歩道 Gifu Prefecture · Moderate · 2.7 mi (4.3 km)
- 白山別当出合線 Gifu Prefecture · Easy · 0.5 mi (0.7 km)
- お池めぐりコース Gifu Prefecture · Easy · 1.8 mi (2.9 km)
GoTrails · Route data: © OpenStreetMap