Bukit Dato Trail

Penang, Malaysia

Out-and-back trail in Penang, Malaysia. Hiking.

Distance
2.4 mi (3.8 km)
Elevation Gain
571 ft (174 m)
Est. Time
1 hr 5 min
High point
728 ft (222 m)
Difficulty
Moderate
Route type
Out & back

Questions about Bukit Dato Trail

How long is Bukit Dato Trail?

Bukit Dato Trail is 2.4 mi (3.8 km) long. Most people take about 1 hr 5 min. It climbs 571 ft (174 m) in total, up to a high point of 728 ft (222 m).

How hard is Bukit Dato Trail?

GoTrails rates it Moderate, from its length and how much it climbs.

Where do you park for Bukit Dato Trail?

No parking mapped: check before you drive.

Are there water and toilets on Bukit Dato Trail?

No water mapped: bring all you need. No toilets mapped.

Is Bukit Dato Trail shaded?

Mostly shaded (83% under trees).

What can you do on Bukit Dato Trail?

Best for Hiking. Surface: paved.

Where can you eat near Bukit Dato Trail?

Da Fei Zai Kopitiam, 0.6 mi (1 km) from the start. 1 more places to eat. Shop: Shell Select, 0.7 mi (1.1 km).

Is this a good week for Bukit Dato Trail?

GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.

Trails near Bukit Dato Trail

GoTrails · Route data: © OpenStreetMap