Jurong Park Connector

Johor, Malaysia

Out-and-back trail in Johor, Malaysia. Road & touring bike.

Distance
1.7 mi (2.7 km)
Elevation Gain
46 ft (14 m)
Est. Time
10 min
High point
52 ft (16 m)
Difficulty
Easy
Route type
Out & back

Features

Questions about Jurong Park Connector

How long is Jurong Park Connector?

Jurong Park Connector is 1.7 mi (2.7 km) long. Most people take about 10 min. It climbs 46 ft (14 m) in total, up to a high point of 52 ft (16 m).

How hard is Jurong Park Connector?

GoTrails rates it Easy, from its length and how much it climbs.

Where do you park for Jurong Park Connector?

Parking at the start. 2 more lots along the route.

Are there water and toilets on Jurong Park Connector?

No water mapped: bring all you need. Toilets: Trailhead.

Is Jurong Park Connector shaded?

Partly shaded (55% under trees).

Is Jurong Park Connector good for kids?

Yes, it is marked as kid friendly. It is marked as wheelchair accessible.

What can you do on Jurong Park Connector?

Best for Road & touring bike. Shared with bikes. Surface: paved.

Where can you eat near Jurong Park Connector?

D'life - Vegetarian, 0.2 mi (0.3 km) from the start. 2 more places to eat. Shop: Shop, 0.2 mi (0.3 km).

Is this a good week for Jurong Park Connector?

GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.

Trails near Jurong Park Connector

GoTrails · Route data: © OpenStreetMap