KFT - (I36-2) - Connection route
Fukushima Prefecture, Japan
Out-and-back trail in Fukushima Prefecture, Japan. Hiking.
- Distance
- 7.2 mi (11.5 km)
- Elevation Gain
- 863 ft (263 m)
- Est. Time
- 2 hr 45 min
- High point
- 1,634 ft (498 m)
- Difficulty
- Hard
- Route type
- Out & back
Questions about KFT - (I36-2) - Connection route
How long is KFT - (I36-2) - Connection route?
KFT - (I36-2) - Connection route is 7.2 mi (11.5 km) long. Most people take about 2 hr 45 min. It climbs 863 ft (263 m) in total, up to a high point of 1,634 ft (498 m).
How hard is KFT - (I36-2) - Connection route?
GoTrails rates it Hard, from its length and how much it climbs.
Where do you park for KFT - (I36-2) - Connection route?
No parking mapped: check before you drive.
Are there water and toilets on KFT - (I36-2) - Connection route?
No water mapped: bring all you need. No toilets mapped.
Is KFT - (I36-2) - Connection route shaded?
Partly shaded (33% under trees).
What can you do on KFT - (I36-2) - Connection route?
Best for Hiking.
Is this a good week for KFT - (I36-2) - Connection route?
GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.
Trails near KFT - (I36-2) - Connection route
- KFT - (I36-1) - Connection route Fukushima Prefecture · Moderate · 3.7 mi (6 km)
- KFT - (I36-2) - Connection route Fukushima Prefecture · Moderate · 3.7 mi (6 km)
- KFT - (I36-1) - Connection route Tochigi Prefecture · Hard · 11.7 mi (18.8 km)
- KFT - T35-1 - Ashino no sato he no michi Tochigi Prefecture · Easy · 5.8 mi (9.4 km)
- KFT - T35-2 - Yoshitune dennsetsu no michi Tochigi Prefecture · Moderate · 7 mi (11.3 km)
- 那須モータースポーツランド Tochigi Prefecture · Easy · 0.7 mi (1.1 km)
- 月待山遊歩道 Fukushima Prefecture · Easy · 1.1 mi (1.8 km)
- お城山展望遊歩道 Fukushima Prefecture · Easy · 0.5 mi (0.9 km)
GoTrails · Route data: © OpenStreetMap