New Boston Rail Trail
Hillsborough County, NH
Out-and-back trail in Hillsborough County, NH. Road & touring bike.
- Distance
- 7.9 mi (12.6 km)
- Elevation Gain
- 89 ft (27 m)
- Est. Time
- 45 min
- High point
- 384 ft (117 m)
- Difficulty
- Easy
- Route type
- Out & back
Features
Questions about New Boston Rail Trail
How long is New Boston Rail Trail?
New Boston Rail Trail is 7.9 mi (12.6 km) long. Most people take about 45 min. It climbs 89 ft (27 m) in total, up to a high point of 384 ft (117 m).
How hard is New Boston Rail Trail?
GoTrails rates it Easy, from its length and how much it climbs.
Where do you park for New Boston Rail Trail?
Parking at the start, Free. 1 more lots along the route.
Are there water and toilets on New Boston Rail Trail?
No water mapped: bring all you need. No toilets mapped.
Is New Boston Rail Trail shaded?
Mostly shaded (100% under trees).
What can you do on New Boston Rail Trail?
Best for Road & touring bike.
Where can you eat near New Boston Rail Trail?
Damien's, 0.5 mi (0.8 km) from the start. 2 more places to eat. Shop: Lions field , 1.5 mi (2.4 km).
Is this a good week for New Boston Rail Trail?
GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.
Trails near New Boston Rail Trail
- Goffstown Rail Trail Hillsborough County · Easy · 0.3 mi (0.6 km)
- White Dot Trail Water Precinct Land · Easy · 1.3 mi (2.1 km)
- Orange Dot Trail Water Precinct Land · Easy · 0.9 mi (1.4 km)
- Goffstown Rail Trail Hillsborough County · Easy · 2.8 mi (4.5 km)
- Link Trail Water Precinct Land · Easy · 1.3 mi (2.1 km)
- Blue Trail Water Precinct Land · Easy · 0.8 mi (1.2 km)
- Red Dot Trail Water Precinct Land · Easy · 0.5 mi (0.9 km)
- Bickford Trail Water Precinct Land · Easy · 1.3 mi (2.1 km)
GoTrails · Route data: © OpenStreetMap