Rathore Trail (under construction)

Drs Amin and Nahid Rathore Conservation Restriction, Worcester County, MA

Out-and-back trail in Drs Amin and Nahid Rathore Conservation Restriction, Worcester County, MA. Hiking & Walking.

Distance
0.6 mi (0.9 km)
Elevation Gain
36 ft (11 m)
Est. Time
10 min
High point
453 ft (138 m)
Difficulty
Easy
Route type
Out & back

Features

Questions about Rathore Trail (under construction)

How long is Rathore Trail (under construction)?

Rathore Trail (under construction) is 0.6 mi (0.9 km) long. Most people take about 10 min. It climbs 36 ft (11 m) in total, up to a high point of 453 ft (138 m).

How hard is Rathore Trail (under construction)?

GoTrails rates it Easy, from its length and how much it climbs.

Where do you park for Rathore Trail (under construction)?

No parking mapped: check before you drive.

Are there water and toilets on Rathore Trail (under construction)?

No water mapped: bring all you need. No toilets mapped.

Is Rathore Trail (under construction) shaded?

Mostly shaded (100% under trees).

Is Rathore Trail (under construction) good for kids?

Yes, it is marked as kid friendly.

What can you do on Rathore Trail (under construction)?

Best for Hiking. Also: Walking. Surface: dirt.

Is this a good week for Rathore Trail (under construction)?

GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.

Trails near Rathore Trail (under construction)

GoTrails · Route data: © OpenStreetMap