Sengkang West Way Park Connector

Johor, Malaysia

Out-and-back trail in Johor, Malaysia. Road & touring bike.

Distance
1.5 mi (2.4 km)
Elevation Gain
46 ft (14 m)
Est. Time
10 min
High point
62 ft (19 m)
Difficulty
Easy
Route type
Out & back

Features

Questions about Sengkang West Way Park Connector

How long is Sengkang West Way Park Connector?

Sengkang West Way Park Connector is 1.5 mi (2.4 km) long. Most people take about 10 min. It climbs 46 ft (14 m) in total, up to a high point of 62 ft (19 m).

How hard is Sengkang West Way Park Connector?

GoTrails rates it Easy, from its length and how much it climbs.

Where do you park for Sengkang West Way Park Connector?

Parking at the start, Fee, 684 spaces. 8 more lots along the route.

Are there water and toilets on Sengkang West Way Park Connector?

Water at the trailhead only: carry enough. Toilets: Trailhead.

Is Sengkang West Way Park Connector shaded?

Mostly exposed (24% under trees).

Is Sengkang West Way Park Connector good for kids?

Yes, it is marked as kid friendly.

What can you do on Sengkang West Way Park Connector?

Best for Road & touring bike.

Where can you eat near Sengkang West Way Park Connector?

Pizza Hut, 0 mi (0.1 km) from the start. 2 more places to eat. Shop: FairPrice, 0.2 mi (0.3 km).

Is this a good week for Sengkang West Way Park Connector?

GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.

Trails near Sengkang West Way Park Connector

GoTrails · Route data: © OpenStreetMap