Sungei Serangoon Park Connector

Johor, Malaysia

Out-and-back trail in Johor, Malaysia. Road & touring bike.

Distance
2.7 mi (4.4 km)
Elevation Gain
115 ft (35 m)
Est. Time
15 min
High point
39 ft (12 m)
Difficulty
Easy
Route type
Out & back

Features

Along the way

From OpenStreetMap. Check before you rely on water or toilets.

Questions about Sungei Serangoon Park Connector

How long is Sungei Serangoon Park Connector?

Sungei Serangoon Park Connector is 2.7 mi (4.4 km) long. Most people take about 15 min. It climbs 115 ft (35 m) in total, up to a high point of 39 ft (12 m).

How hard is Sungei Serangoon Park Connector?

GoTrails rates it Easy, from its length and how much it climbs.

Where do you park for Sungei Serangoon Park Connector?

Parking at the start. 7 more lots along the route.

Are there water and toilets on Sungei Serangoon Park Connector?

Drinking water on the way at 1 mi (1.7 km). Toilets: 1 mi (1.7 km).

Is Sungei Serangoon Park Connector shaded?

Mostly exposed (29% under trees).

Is Sungei Serangoon Park Connector good for kids?

Yes, it is marked as kid friendly.

What can you do on Sungei Serangoon Park Connector?

Best for Road & touring bike.

Where can you eat near Sungei Serangoon Park Connector?

Texas Chicken, 0.2 mi (0.3 km) from the start. 2 more places to eat. Shop: FairPrice, 0.2 mi (0.3 km).

Is this a good week for Sungei Serangoon Park Connector?

GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.

Trails near Sungei Serangoon Park Connector

GoTrails · Route data: © OpenStreetMap