Trans Gading Batu Putih Trail

Hutan Simpanan Kekal Bukit Tapah, Perak, Malaysia

Out-and-back trail in Hutan Simpanan Kekal Bukit Tapah, Perak, Malaysia. Hiking.

Distance
12 mi (19.3 km)
Elevation Gain
5,089 ft (1,551 m)
Est. Time
6 hr 25 min
High point
6,942 ft (2,116 m)
Difficulty
Expert
Route type
Out & back

Features

Along the way

From OpenStreetMap. Check before you rely on water or toilets.

Questions about Trans Gading Batu Putih Trail

How long is Trans Gading Batu Putih Trail?

Trans Gading Batu Putih Trail is 12 mi (19.3 km) long. Most people take about 6 hr 25 min. It climbs 5,089 ft (1,551 m) in total, up to a high point of 6,942 ft (2,116 m).

How hard is Trans Gading Batu Putih Trail?

GoTrails rates it Expert, from its length and how much it climbs.

Where do you park for Trans Gading Batu Putih Trail?

No parking mapped: check before you drive.

Are there water and toilets on Trans Gading Batu Putih Trail?

No water mapped: bring all you need. No toilets mapped.

Is Trans Gading Batu Putih Trail shaded?

Mostly shaded (100% under trees).

What can you do on Trans Gading Batu Putih Trail?

Best for Hiking.

Is this a good week for Trans Gading Batu Putih Trail?

GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.

Trails near Trans Gading Batu Putih Trail

GoTrails · Route data: © OpenStreetMap