Yishun Park Connector

Johor, Malaysia

Out-and-back trail in Johor, Malaysia. Road & touring bike.

Distance
4.1 mi (6.6 km)
Elevation Gain
194 ft (59 m)
Est. Time
25 min
High point
82 ft (25 m)
Difficulty
Easy
Route type
Out & back

Features

Along the way

From OpenStreetMap. Check before you rely on water or toilets.

Questions about Yishun Park Connector

How long is Yishun Park Connector?

Yishun Park Connector is 4.1 mi (6.6 km) long. Most people take about 25 min. It climbs 194 ft (59 m) in total, up to a high point of 82 ft (25 m).

How hard is Yishun Park Connector?

GoTrails rates it Easy, from its length and how much it climbs.

Where do you park for Yishun Park Connector?

Parking at the far end. 13 more lots along the route.

Are there water and toilets on Yishun Park Connector?

No water mapped: bring all you need. Toilets: Trailhead.

Is Yishun Park Connector shaded?

Mostly exposed (20% under trees).

What can you do on Yishun Park Connector?

Best for Road & touring bike.

Where can you eat near Yishun Park Connector?

State Of Mind, 0.2 mi (0.3 km) from the start. 2 more places to eat. Shop: Prime SuperMarket, 0.2 mi (0.3 km).

Is this a good week for Yishun Park Connector?

GoTrails turns the 7-day forecast at the start and at the high point into a clear go / no-go: temperature, rain, storms, wind, heat, air quality and daylight, with a suggested start time. This week’s call is at the top of this page.

Trails near Yishun Park Connector

GoTrails · Route data: © OpenStreetMap